This is the notch where the main beam was |
Sistering on the edges gives the base for the new main beam that needs to be put in place.
The new beam is three 2x10 by 12ft boards glued and nailed together hung with a joist hanger. |
We gained a lot of room by getting rid of the tank water heater that was in the corner under the door. We painted the old wood as a way to check if we still have an issue with powder post beetles. It was a very productive day and we got things in as opposed to taking them out. The three of us worked reasonably well! Only two incidences occurred, both to Kevin (he's ok though, really!). Thanks Dad for the help!!!
good thing Kevin helped put in the hay loft in our pole barn I guess.