Sunday, March 2, 2014

COLOR!!!!

View from downstairs, this gives the best showing of the hall green




Office
My desk and a massive pile of computers! Kitties are enjoying the warm upstairs
When weather gets warmer I plan on spray painting the file cabinet
 
 Camouflage air vent:

 The wall with the vent pipe is going to be painted the same white as the trim and ceiling, but even better will be the massive chalkboard that will be painted on it!

 Hall

 The green doesn't really photograph well in the morning light, so I only have one good shot of it.


Bedroom/Hall accent wall (CRACKER BITZ)
Main hall color (SOFT FERN)

Main office color (SEASCAPE GREEN)
The chalkboard is going to be a dark gray called Moonstone.





Thursday, January 30, 2014

4 walls and a filing cabinet an office does make

We have a completed room upstairs!!!!!!!!!!!!!!!!!!!!!!!!
The office now has all four walls completed and I even get a built in filing cabinet!




View from bedroom. The far part will be a shelf/cubby area

Backside of file cabinet. The area above will be a storage nook toward bedroom.

The closet will be here eventually.


Monday, January 27, 2014

INTERIOR WALLS!!!!

Super Exciting Day! We got interior walls upstairs! Happy Dance!!!
Main Bedroom Side


Showing the Hall Wall from the Main Bedroom with completed Bedroom Wall (Notice the paint cans?)

Hall Side looking into the bedroom



 Then there's the center wall! We rebuilt this wall completely which made it the straightest one in the entire house.
Hall Side


Office side wall. The PVC pipe is a vent pipe and will get painted.


Still can see into the bedroom from the Office
 So after a year, we got blinds on the window in the kitchen! The sun was glaring off the TV too much today so they finally went up. Once upstairs is done and we move the entertainment to the living room, maybe we'll finish the wall.


Wednesday, January 15, 2014

1 Year Anniversary

We've had the house a whole year now! YAY! A whole bunch of the upstairs is drywalled! Exterior walls are  complete with the exception of under the windows. The office has also received its first layer of mud! Once that gets done everything can move from the main bedroom over so that room can be completed. Need to make another sheetrock run to replenish the supply. ~_^













Tuesday, November 12, 2013

Finished Insulation!!!

With some parental help we got a lot of the upstairs's insulation completed and tonight we completed it.









 There was still a lot of junk left over upstairs and that all went out the window.





It was then loaded up and  in the truck and hauled to the dump. It was 1740 lbs worth of wood. This also meant we got rid of those timbers that once held up the kitchen floor.

The remaining pictures show Kevin's awesome framing job for the closet and the upstairs's register.