With some parental help we got a lot of the upstairs's insulation completed and tonight we completed it.
There was still a lot of junk left over upstairs and that all went out the window.
It was then loaded up and in the truck and hauled to the dump. It was 1740 lbs worth of wood. This also meant we got rid of those timbers that once held up the kitchen floor.
The remaining pictures show Kevin's awesome framing job for the closet and the upstairs's register.
No comments:
Post a Comment