On the main rafter of the roof there is a bracing plate that has the name Preston carved into it.
Kevin ran the wires into the walls and back to the panel. They aren't plugged in yet, but this means we can proceed with the floor.
Beautiful new sill plate in place with the notches in place for the wires to make it through safely. Now that the plate is down we can get on with the plywood. Interestingly, the kitchen side is about 4 inches narrower than the dining room side which means that our 8 foot boards don't land nicely on a joist and cutting or notching is going to be needed.
No comments:
Post a Comment