Took out the pass through and ran into something new, the previous remodel double drywalled the area. It wasn't that they had painted the first layer and wanted to cover it, they were using drywall to even out the wall.
The finished wall and some interesting use of electrical tape.
|
Pulled off the final slat and panels from the wall where the sink goes. |
Light fixtures in place and they work!
|
We have three-way light switches!!! |
|
Two working light switches in a box |
No comments:
Post a Comment