I haven't been able to do much with the house. When I get off of work, it's already dark and we don't exactly have lights to be able to do anything. (Plus the house is currently really creepy after dark) In the mean time, Kevin has been putting in some solo time and gotten a lot done. The kitchen side ceiling is now down. There's lots of clean up that needs to happen. He has sorted out the electrical panel and we are now up to two (!) outlets and a basement light hooked up along with the furnace, of course. With very little exception the gutting is done, you can see some of remaining yellow and green drywall, so next step is confirming our kitchen layout so he can set forth on the adventure of wiring and we can proceed.