Tuesday, January 29, 2013

Hello Heat; Good-bye Floor


Yesterday we made another supply run. This trip wasn't as heavily loaded down as the first. We decided on the bathtub and surround and picked up another piece of lumber. This time we got the red flag stapled in place.







We had a bit of rain last night and the snow melted along with it. So we went to the house to find a duck pond in the backyard.The foundation is also showing us where the seams are going to give us problems.


 The contractor came in today and found the gas leak. There were two spots that were leaking and were easily fixed, which means we don't have to replace the line and can save a bit of money that way. Since the contractor work is done we can now start on the insane part of the demolition: getting rid of the kitchen sub-floor.
 


Another ax cut is through the wider of the timbers and we think this was used to help hoist the logs into place.